Skip to main content
Moxie Docs
All guides

Cyber Resilience Act

CRA technical file requirements: what Annex VII asks for, and what your repository can supply

The EU Cyber Resilience Act asks every manufacturer of a product with digital elements for technical documentation before the product is placed on the EU market. This guide goes through Annex VII item by item, says what each one needs, and separates what can be drafted from a code repository from what only the manufacturer can write.

Definition: The CRA technical file is the technical documentation required by Article 31 and Annex VII of Regulation (EU) 2024/2847. It records how a product with digital elements and the manufacturer's processes meet the essential cybersecurity requirements in Annex I, must be drawn up before the product is placed on the EU market, kept up to date during the support period, and retained for at least 10 years or the support period, whichever is longer.

Last reviewed: November 23, 2026

Find your CRA gaps before December 11, 2027

The free readiness check reads a public GitHub repository and reports eight technical file inputs as found, missing or cannot tell, with a fix for each. No signup.

Check my repository free

Who needs a CRA technical file?

The CRA applies to products with digital elements made available on the EU market whose intended or reasonably foreseeable use includes a data connection to a device or network (Article 2). A product with digital elements is a software or hardware product and its remote data processing solutions (Article 3, points 1 and 2). Making available means supplying it in the course of a commercial activity, whether paid or free (Article 3, point 22).

Two common cases fall outside. A SaaS product on its own is covered by the NIS2 Directive rather than the CRA, though a backend that an app or device needs to perform a function counts as that product's remote data processing (recitals 11 and 12). Free and open-source software that its manufacturer does not monetise is not supplied in the course of a commercial activity (recital 18).

The manufacturer draws up the file before placing the product on the market and keeps it up to date, where appropriate, at least during the support period (Article 31). It is kept with the EU declaration of conformity for at least 10 years after placing on the market, or for the support period if longer (Article 13(13)).

When do the CRA obligations apply?

The CRA entered into force on December 10, 2024. Reporting of actively exploited vulnerabilities and severe incidents under Article 14 applies from September 11, 2026, and the rest of the Regulation, including the essential requirements, technical documentation and conformity assessment, applies from December 11, 2027 (Article 71; European Commission).

Reports go to the coordinating CSIRT and ENISA through the single reporting platform established by ENISA, which the Commission says has been operational since September 11, 2026 (CRA reporting obligations): an early warning within 24 hours of becoming aware of an actively exploited vulnerability, a vulnerability notification within 72 hours, and a final report no later than 14 days after a corrective or mitigating measure is available. Severe incidents follow the same 24 and 72 hour steps, with a final report within one month of the incident notification (Article 14).

What does Annex VII require, item by item?

Annex VII lists the minimum content, as applicable to the product:

  1. A general description of the product: its intended purpose, the versions of software affecting compliance with the essential requirements, photographs or illustrations for hardware, and the user information and instructions in Annex II.
  2. A description of design, development, production and vulnerability handling: design and development information including a description of the system architecture, explaining how software components build on or feed into each other; the vulnerability handling processes, including the software bill of materials, the coordinated vulnerability disclosure policy, evidence of a contact address for reporting vulnerabilities and the technical solutions for secure distribution of updates; and the production and monitoring processes.
  3. The cybersecurity risk assessment under Article 13, including how the Annex I, Part I requirements apply.
  4. The information used to determine the support period under Article 13(8).
  5. The harmonised standards, common specifications or certification schemes applied, in full or in part, or where none were applied, descriptions of the solutions adopted to meet Annex I.
  6. Reports of the tests carried out to verify conformity of the product and of the vulnerability handling processes.
  7. A copy of the EU declaration of conformity.
  8. The software bill of materials, where applicable, further to a reasoned request from a market surveillance authority.

Article 33(5) provides for a simplified technical documentation form for microenterprises and small enterprises, to be specified by the Commission in an implementing act (Article 33). On November 23, 2026, the Commission's CRA page for micro, small and medium-sized enterprises still said it "may also establish" that form, so as far as that page shows it has not been issued yet.

Which requirements does the file have to evidence?

Annex I has two parts. Part I covers product properties: an appropriate level of cybersecurity based on the risks, no known exploitable vulnerabilities at release, secure by default configuration, security updates, access control, confidentiality and integrity of data, data minimisation, availability, limited attack surfaces, exploitation mitigation, security logging and secure data removal. Part II covers vulnerability handling: an SBOM covering at least top-level dependencies, prompt remediation, regular security testing, disclosure of fixed vulnerabilities, a coordinated vulnerability disclosure policy, a contact address for reports, secure update distribution, and free security updates with advisories.

The support period must reflect how long the product is expected to be in use and be at least five years, unless the product is expected to be in use for less (Article 13(8)). Its end date, with at least the month and year, is stated at the time of purchase (Article 13(19)).

Conformity with harmonised standards whose references are published in the Official Journal gives a presumption of conformity for the requirements they cover (Article 27). When we checked on November 23, 2026, the Commission's CRA standardisation page described the standardisation request but listed no standard cited in the Official Journal. Until one is cited, Annex VII, point 5 asks you to describe the solutions you adopted to meet Annex I instead.

What can a repository supply, and what can't it?

A repository holds evidence for the descriptive half of the file: the components and how they connect (point 2(a)), the dependencies an SBOM is built from (point 2(b)), the security policy and reporting contact if they are committed, release tags for the versions covered (point 1(b)), the CI pipeline behind production and update distribution (points 2(b) and 2(c)), and configuration that shows secure defaults. A tool can draft those sections and cite the files they came from.

It cannot supply the judgements. The risk assessment, the intended purpose and reasonably foreseeable use, the support period, the choice of standards and conformity assessment procedure, test reports, hardware photographs and the signed declaration of conformity come from the manufacturer. Any draft should mark those fields as needing input rather than fill them with guesses.

To see which inputs a public repository already has, run the free CRA readiness check. To write the file by hand, start from the CRA technical documentation template.

At a glance

Which Annex VII items can a repository supply?

Where each item's evidence usually comes from. Repository-derived content is a draft for the manufacturer to review.

1. General description

Draftable from the repository

What the software does, components, versions from release tags

Needs the manufacturer

Intended purpose, foreseeable use, hardware photos

2(a). Design and architecture

Draftable from the repository

System architecture, how components feed into each other, diagrams

Needs the manufacturer

Design rationale not visible in code, hardware schematics

2(b). Vulnerability handling

Draftable from the repository

SBOM from manifests and lockfiles, existing policy and contact, update pipeline

Needs the manufacturer

The real contact, response commitments, process ownership

2(c). Production and monitoring

Draftable from the repository

Build and release workflows

Needs the manufacturer

Monitoring and validation of those processes

3. Risk assessment

Draftable from the repository

Interfaces and data flows to assess

Needs the manufacturer

The assessment and every judgement in it

4. Support period

Draftable from the repository

Release history

Needs the manufacturer

The period and its end date

5. Standards applied

Draftable from the repository

Evidence of the solutions adopted

Needs the manufacturer

Which standards or specifications were applied

6. Test reports

Draftable from the repository

CI test and scan results as inputs

Needs the manufacturer

The conformity test reports

7. Declaration of conformity

Draftable from the repository

Product name and version

Needs the manufacturer

The signed declaration

8. SBOM on request

Draftable from the repository

Per-release SBOM files

Needs the manufacturer

Responding to the authority

Where Moxie Docs fits

Moxie Docs connects to your GitHub repository and drafts the parts of the technical file code can support: the architecture and design description, a CycloneDX JSON SBOM of top-level dependencies, and an evidence map for each Annex I essential requirement, citing the source files behind each statement and built from the latest index. The product description, vulnerability handling, user security information, risk-assessment worksheet and declaration template are in development. Every draft marks the fields only the manufacturer can complete, and Moxie Docs never declares a product compliant.

FAQ

Frequently asked questions

Quick answers to the questions developers ask about CRA technical file requirements.

Get started

See which technical file inputs your repository already has.

Answer two scope questions and enter a public GitHub repository. In a few seconds you get eight findings, each tied to the article or annex it relates to and a fix. Free, no signup.